Case Studies

Enterprise Data Warehouse for Mid-Market: The $180K Project

From Excel hell to unified analytics: a 300-person company's 14-month journey implementing a modern data warehouse. Real costs, migration challenges, and $520K annual value from actually understanding their data.

January 16, 2025
19 min read
By Thalamus AI

Enterprise Data Warehouse for Mid-Market: The $180K Project

Here's the uncomfortable truth about data in growing companies: everyone has different numbers, nobody trusts the reports, and half your leadership meetings devolve into arguments about whose spreadsheet is correct.

We worked with a 300-person distribution company—we'll call them DistribCo—doing $85M in annual revenue across 8 product lines and 4 geographic regions. They had data everywhere: ERP system, CRM, warehouse management, e-commerce platform, accounting system, and roughly 400 Excel spreadsheets of varying importance and accuracy.

Nobody could answer simple questions like "what's our actual margin by product line?" or "which customers are actually profitable?" without spending 2-3 days collecting data from different systems and hoping the joins were correct.

This is the story of implementing a proper enterprise data warehouse in a mid-market company. Total investment: $180,000 over 14 months. Result: unified analytics, trusted reporting, and data-driven decisions that generated $520K in identified cost savings within the first year.

Here's what actually happened, including the painful parts.

The Excel Hell Baseline

Before we talk solutions, let's quantify the problem.

The Spreadsheet Situation

427 business-critical Excel files across the organization:

  • Sales forecasts (12 versions, nobody knew which was current)
  • Inventory analysis (each warehouse had their own)
  • Customer profitability calculations (finance had one, sales had another)
  • Commission calculations (frequently disputed)
  • Pricing models (3 different versions)
  • Product performance reports (conflicting numbers)

37 hours per week of analyst time spent manually compiling reports:

  • Extracting data from 6 different systems
  • Copy-paste into master spreadsheets
  • Manually reconciling discrepancies
  • Fixing formulas that broke
  • Emailing reports that were out of date by time people read them

19% error rate in compiled reports (we audited 3 months of reports):

  • Wrong date ranges
  • Incorrect joins between data sources
  • Copy-paste errors
  • Formula errors
  • Stale data

Zero version control: If someone wanted to know what the numbers were last month, nobody could reliably recreate them.

The Real Costs

$240,000 annually in analyst time spent on manual data compilation instead of actual analysis.

$180,000 annually in bad decisions from wrong data:

  • Overstocked slow-moving inventory ($85K)
  • Underpriced products ($45K margin loss)
  • Missed early warning signs on customer churn ($50K)

Uncountable cost in leadership time arguing about whose numbers were right, delayed decisions waiting for data, and strategic guesses because real analysis was too hard.

The CFO put it perfectly: "We're a $85M company making decisions like we're still in someone's garage."

Why This Happens

DistribCo didn't choose chaos. They grew into it:

Year 1-3: Excel worked great. Small team, simple business, easy to track.

Year 4-7: Added new product lines, opened more warehouses, hired more people. Excel started straining but still worked-ish.

Year 8-10: Implemented ERP (huge project). Added CRM. Built e-commerce platform. Each new system created new data silos.

Year 11-12: Excel became the glue holding everything together. Analysts became data plumbers instead of analysts.

By the time we met them, they knew they had a problem. They just didn't know how to fix it without risking the business or spending $2M on an enterprise implementation.

The Architecture Decision: Three Paths

We evaluated their options:

Option 1: BI Tool on Top of Existing Chaos ($40K)

Buy Tableau or Power BI, connect directly to source systems, build dashboards.

Pros:

  • Fast implementation (6-8 weeks)
  • Lowest upfront cost
  • Pretty dashboards

Cons:

  • Doesn't solve the underlying data fragmentation
  • Still requires manual data prep for complex analysis
  • Performance issues querying multiple source systems
  • Garbage in, garbage out (doesn't fix data quality)
  • Doesn't handle historical analysis well

Verdict: This is putting lipstick on a pig. Solves visualization, not the actual data problem.

Option 2: Enterprise Data Platform ($800K+)

Hire Big Consulting Firm, implement Snowflake or similar with full enterprise bells and whistles.

Pros:

  • Comprehensive solution
  • Handles current + future scale
  • All the features

Cons:

  • $800K-$1.2M implementation cost
  • 18-24 month timeline
  • Requires dedicated data team to maintain
  • Massive organizational disruption
  • Overkill for current needs

Verdict: Solving the problem by buying enterprise-scale solutions they won't use 80% of. Not economically rational.

Option 3: Right-Sized Modern Data Warehouse ($180K)

Build proper data warehouse using modern cloud architecture, sized for 300-person company with room to grow to 1,000.

Pros:

  • Solves the actual problem (unified, clean, historical data)
  • Modern cloud-based architecture (scales as they grow)
  • Reasonable cost and timeline
  • Builds internal capability
  • Foundation for future analytics

Cons:

  • 12-14 month implementation
  • Requires some technical capability
  • Migration effort for historical data
  • Ongoing maintenance needed

Verdict: This is what we built. Here's the technical architecture and implementation story.

The Technical Architecture

We designed a cloud-based data warehouse following the modern analytics stack pattern:

%%{init: {'theme':'base', 'themeVariables': {
  'primaryColor':'#e3f2fd',
  'primaryTextColor':'#0d47a1',
  'primaryBorderColor':'#1976d2',
  'secondaryColor':'#f3e5f5',
  'secondaryTextColor':'#4a148c',
  'tertiaryColor':'#fff3e0',
  'tertiaryTextColor':'#e65100'
}}}%%
graph TB
    SOURCES[Source Systems]
    EXTRACT[Extraction Layer]
    RAW[Raw Data Lake]
    TRANSFORM[Transformation Layer]
    WAREHOUSE[Data Warehouse]
    SEMANTIC[Semantic Layer]
    BI[BI & Analytics Layer]

    ERP[ERP System] --> EXTRACT
    CRM[Salesforce CRM] --> EXTRACT
    WMS[Warehouse Mgmt] --> EXTRACT
    ECOM[E-commerce] --> EXTRACT
    ACCT[Accounting] --> EXTRACT

    EXTRACT --> RAW
    RAW --> TRANSFORM
    TRANSFORM --> WAREHOUSE
    WAREHOUSE --> SEMANTIC
    SEMANTIC --> BI

    BI --> TABLEAU[Tableau]
    BI --> EXCEL[Excel/Sheets]
    BI --> CUSTOM[Custom Dashboards]

    style SOURCES fill:#e8f5e9,stroke:#388e3c,color:#1b5e20
    style EXTRACT fill:#e3f2fd,stroke:#1976d2,color:#0d47a1
    style RAW fill:#fff3e0,stroke:#f57c00,color:#e65100
    style TRANSFORM fill:#f3e5f5,stroke:#7b1fa2,color:#4a148c
    style WAREHOUSE fill:#e3f2fd,stroke:#1976d2,color:#0d47a1
    style SEMANTIC fill:#f3e5f5,stroke:#7b1fa2,color:#4a148c
    style BI fill:#e8f5e9,stroke:#388e3c,color:#1b5e20

Layer 1: Source Systems (What We Had to Work With)

Five primary data sources:

  • ERP (SAP Business One): orders, inventory, products, vendors
  • Salesforce: customers, opportunities, activities, contacts
  • Warehouse Management System (custom): shipping, receiving, locations
  • E-commerce platform (Magento): online orders, customer behavior
  • Accounting (NetSuite): financial transactions, GL, payables/receivables

Plus 47 Excel spreadsheets we identified as containing critical business logic or historical data not in any system.

Layer 2: Extraction Layer (Getting Data Out)

We built extraction pipelines for each source:

ERP Extraction:

  • Direct database connection (read replica to avoid production impact)
  • Incremental extraction (only changed records)
  • Runs every 4 hours
  • ~85,000 records daily average

Salesforce Extraction:

  • Salesforce API + bulk API for historical
  • Incremental sync based on modified date
  • Runs every 2 hours
  • ~12,000 records daily

Warehouse Management:

  • Direct database connection
  • Real-time shipping/receiving events via webhooks
  • Historical batch extraction for setup

E-commerce:

  • API extraction
  • Real-time order webhooks
  • Customer behavior batch extraction daily

Accounting:

  • NetSuite API (rate-limited, required careful orchestration)
  • Daily full extract of transactions
  • Monthly reconciliation process

Technology: We used Fivetran for most connectors (saved development time), custom Python scripts for systems Fivetran didn't support.

Cost: $2,400/month for Fivetran + $800/month custom pipeline infrastructure

Layer 3: Raw Data Lake (Preservation Layer)

Every extracted record lands in AWS S3 in its original format:

  • Complete history preserved
  • Immutable (never modified or deleted)
  • Partitioned by date and source
  • Compressed for cost efficiency

Purpose:

  • Audit trail
  • Ability to reprocess if transformation logic changes
  • Disaster recovery
  • Compliance (some data retention requirements)

Storage cost: ~$400/month (3 years of history)

Layer 4: Transformation Layer (Making Data Useful)

This is where raw data becomes business intelligence. We used dbt (data build tool) for transformations:

Data Cleaning:

  • Standardized date formats (sources used 4 different conventions)
  • Normalized customer names (same customer, 3 different spellings)
  • Currency conversions (multi-currency business)
  • Removed test/invalid records
  • Fixed known data quality issues

Business Logic Implementation:

  • Product hierarchy (category → subcategory → product)
  • Customer segmentation (15 different segments based on behavior)
  • Geography mapping (zip → city → region → territory)
  • Time dimensions (fiscal calendar, standard calendar, week numbering)
  • Cost allocation rules (previously only in analyst heads)

Calculated Metrics:

  • Gross margin (different calculation by product line)
  • Customer lifetime value
  • Inventory turns
  • Days sales outstanding
  • Product velocity

Historical Reconstruction: This was painful but necessary. We rebuilt 3 years of history using archived data exports, old spreadsheets, and database backups.

Transformation Technology: dbt for SQL-based transformations, Python for complex business logic

Key insight: All transformation logic is version-controlled in Git. When someone asks "how is margin calculated?" we can show them the code. No more black boxes.

Layer 5: Data Warehouse (The Single Source of Truth)

We used Snowflake for the actual warehouse:

Star Schema Design: Dimensional modeling with:

  • Fact tables: Sales transactions, inventory movements, customer activities, financial transactions
  • Dimension tables: Products, customers, time, geography, employees, vendors

Why star schema: Easy for business users to understand, good query performance, well-established pattern that future analysts will know.

Data refresh cadence:

  • Transactional data: 4-hour lag maximum
  • Operational dashboards: Real-time for critical metrics
  • Historical analysis: Daily refresh sufficient

Snowflake costs: $3,200/month (started at $1,800, grew with usage)

Layer 6: Semantic Layer (Business-Friendly View)

Built using Looker's semantic modeling:

Business-oriented metrics:

  • "Customer profitability" (not complex SQL joins)
  • "Product margin" (handles all the business logic)
  • "Inventory health" (composite calculation)

Self-service for common questions:

  • Sales team can slice revenue by any dimension
  • Operations can analyze inventory without SQL
  • Finance can drill into margin calculations

Governed access: Right data to right people, respecting security and privacy.

Looker cost: $4,000/month

Layer 7: BI & Analytics

Multiple consumption options:

Tableau dashboards for executives:

  • Revenue dashboard (real-time)
  • Customer health (daily)
  • Inventory analytics (4-hour lag)
  • Financial KPIs (daily)

Custom web dashboards for operations:

  • Warehouse performance (real-time)
  • Order fulfillment status (real-time)
  • Shipping logistics (real-time)

Excel/Google Sheets still supported:

  • Direct connection to semantic layer
  • No more copy-paste
  • Refreshable data connections
  • Pivot tables that actually work

Tableau cost: $2,800/month for licenses

Implementation Timeline: 14 Months of Hard Work

Months 1-2: Discovery & Design

Data inventory: Catalogued every data source, understood every "critical" spreadsheet

Business requirements: 47 interviews with stakeholders across all departments. What questions do you need answered? What decisions are you making? What data do you trust (or not trust)?

Data quality assessment: Audited source systems for completeness, accuracy, consistency. Found lots of problems.

Architecture design: Selected technology stack, designed schema, planned migration approach

Key decision: Build vs. buy for transformation layer. We chose dbt (open source) over proprietary ETL tools. Saved $60K in licensing, built transferable skills.

Cost: $24K (consulting time + employee time)

Months 3-4: Foundation

Cloud infrastructure setup:

  • AWS accounts and networking
  • Snowflake warehouse provisioning
  • Fivetran connector configuration
  • Security and access controls

Initial extraction pipelines:

  • Started with ERP (most complex)
  • Then Salesforce (highest data quality)
  • Validated data extraction completeness

Raw data lake established:

  • S3 buckets configured
  • Lifecycle policies set
  • Data catalog implemented

Cost: $18K (engineering + infrastructure)

Months 5-7: Data Pipeline Construction

All extraction pipelines built and tested:

  • Remaining source systems connected
  • Incremental extraction logic implemented
  • Error handling and monitoring
  • Data validation checks

Transformation layer development:

  • Cleaning logic for each source
  • Business logic implementation
  • Metric calculations
  • Historical data reconstruction

Challenge: Historical data reconstruction took 6 weeks longer than planned. Old data was messy, incomplete, sometimes contradictory. Required business stakeholder involvement to make reconciliation decisions.

Cost: $38K (engineering + extended timeline)

Months 8-9: Warehouse & Semantic Layer

Star schema implementation in Snowflake:

  • Fact tables built from transformed data
  • Dimensions populated
  • Referential integrity implemented
  • Performance optimization

Semantic layer in Looker:

  • Business metrics defined
  • Calculation logic implemented
  • Security roles configured
  • Self-service exploration enabled

Beta testing with finance team:

  • They found 14 calculation discrepancies
  • 8 were bugs we fixed
  • 6 were actually errors in their old spreadsheets
  • Trust began building

Cost: $26K (engineering + Looker setup)

Months 10-11: BI Layer & Dashboards

Tableau dashboard development:

  • Executive dashboard (revenue, margin, customer health)
  • Sales dashboards (pipeline, forecast, performance)
  • Operations dashboards (inventory, shipping, warehouse)
  • Finance dashboards (GL, cash flow, P&L)

Custom operational dashboards:

  • Real-time warehouse performance
  • Order fulfillment tracking
  • Shipping logistics

Excel integration:

  • Connection guides
  • Template workbooks
  • Power Query setup for self-service

Training materials created:

  • Video tutorials
  • Quick reference guides
  • Self-service best practices

Cost: $24K (development + training)

Months 12-13: User Acceptance & Training

Phased rollout:

  • Month 12 Week 1: Finance team (8 people)
  • Month 12 Week 3: Executive team (12 people)
  • Month 13 Week 1: Sales leadership (15 people)
  • Month 13 Week 2: Operations (25 people)
  • Month 13 Week 4: Full company access (remaining 240 people)

Training sessions:

  • Role-specific training
  • Office hours for questions
  • Champions program (power users helping peers)

Parallel operation:

  • Ran old and new systems simultaneously for 8 weeks
  • Reconciled every discrepancy
  • Built trust through transparency

Major incident: Week 3 of finance rollout, margin calculations were off by 2.3% due to a transformation bug. We found it, fixed it, reprocessed all historical data, and documented what happened. Transparency built more trust than if it never happened.

Cost: $16K (training + support)

Month 14: Optimization & Handoff

Performance tuning:

  • Query optimization (some dashboards were slow)
  • Warehouse sizing adjustments
  • Data refresh scheduling refinements

Documentation:

  • Technical architecture docs
  • Business logic documentation
  • Operational runbooks
  • Troubleshooting guides

Knowledge transfer to internal team:

  • Hired data engineer (already budgeted)
  • Shadowing and training
  • Handoff of maintenance responsibilities

Cost: $14K (optimization + handoff)

Total Project Cost Breakdown

PhaseDurationCostKey Deliverables
Discovery & Design2 months$24,000Architecture, requirements
Foundation2 months$18,000Infrastructure, initial pipelines
Data Pipelines3 months$38,000All extractions, transformations
Warehouse & Semantic2 months$26,000Star schema, business metrics
BI & Dashboards2 months$24,000Tableau, custom dashboards
UAT & Training2 months$16,000Rollout, training, adoption
Optimization1 month$14,000Performance, handoff
Total14 months$160,000Complete data platform

Additional costs:

  • Technology licensing (initial setup): $12,000
  • Historical data reconstruction (extra time): $8,000
  • Total project: $180,000

Ongoing monthly costs: $13,200

  • Snowflake: $3,200
  • Looker: $4,000
  • Tableau: $2,800
  • Fivetran: $2,400
  • Infrastructure: $800

Annual operating cost: ~$158,000 (plus one data engineer: $95K salary)

Results: What Changed in the Business

Quantified Productivity Gains

37 hours/week of analyst time reclaimed:

  • Previously: manual data compilation
  • Now: actual analysis and insights
  • Annual value: $125,000 in productive work vs. data plumbing

19% error rate → 0.3% in business reports:

  • Automated data pipelines + validation
  • Version-controlled transformation logic
  • Single source of truth
  • Value: Immeasurable (fewer bad decisions)

Report delivery time:

  • Was: 2-3 days for custom analysis
  • Now: Self-service, instant for common questions
  • Impact: Faster decision-making, less bottleneck

Strategic Insights That Drove Value

Product profitability revelation ($180K impact):

  • Discovered 3 product lines with negative true margin (freight costs weren't properly allocated)
  • Two lines discontinued, one repriced
  • Annual margin improvement: $180K

Customer profitability analysis ($140K impact):

  • Identified 23 customers with negative lifetime value
  • Renegotiated terms with 18, exited 5 relationships
  • Freed up working capital, improved focus
  • Annual impact: $140K

Inventory optimization ($150K impact):

  • Data revealed overstock of slow movers ($85K tied up)
  • Understock of fast movers (stockouts costing $65K in lost sales)
  • Adjusted purchasing and warehouse allocation
  • One-time cash freed: $85K
  • Annual sales capture: $65K

Regional performance differences ($50K impact):

  • West region significantly underperforming
  • Data showed pricing was too low for freight costs in that geography
  • Adjusted pricing, improved profitability
  • Annual impact: $50K

Total identified value in first year: $520K

Organizational Changes

Decision-making shifted from opinion-based to data-based:

  • Weekly exec meetings: 60% less time arguing about numbers
  • Strategic planning used actual trend data, not gut feel
  • Resource allocation based on ROI analysis

New capabilities unlocked:

  • Customer churn prediction model (built in month 18)
  • Dynamic pricing optimization (in development)
  • Demand forecasting (in development)
  • None of these were possible without unified data

Cultural shift:

  • "What does the data say?" became the common question
  • Analysts became strategic partners, not report factories
  • Data literacy increased across organization

What Didn't Work as Planned

Adoption was uneven: Sales team embraced it immediately (visibility into pipeline). Warehouse managers resisted for 6 months ("my spreadsheet works fine"). Eventually peer pressure and management mandate won.

Data quality issues persisted: Garbage in, garbage out is real. The warehouse exposes data problems it doesn't create them. We spent months 15-20 on data quality initiatives in source systems.

Some Excel users never transitioned: 40-50 people still maintain personal spreadsheets for niche analysis. That's okay—they can now connect to clean data instead of copying it.

Performance tuning is ongoing: As usage grew, some queries slowed down. Continuous optimization required, not set-and-forget.

ROI Analysis: Did It Pay Off?

3-Year Total Cost of Ownership

Implementation: $180,000 Annual operating: $158,000 Data engineer: $95,000/year 3-year total: $939,000

3-Year Value Delivered

Productivity gains (conservative): $125K × 3 = $375,000 Strategic insights (first year): $520,000 Ongoing optimization (years 2-3, conservative): $300K/year × 2 = $600,000 Bad decision avoidance (unquantified but real): Conservatively $100K/year = $300,000

3-year value: $1,795,000

Net ROI: 91% Payback period: 13 months

But here's the real value: DistribCo now makes decisions based on data instead of Excel arguments.

They identified $520K in cost savings and revenue opportunities they couldn't see before. They avoided an unknowable amount in bad decisions from wrong data. They built a foundation for advanced analytics, machine learning, and AI capabilities.

The CFO told us: "I can't believe we operated a $85M company without this. It's like we were flying blind and didn't know it."

Lessons for Other Mid-Market Companies

1. You probably need this sooner than you think

If you're over $20M in revenue and making strategic decisions based on Excel spreadsheets, you're flying blind. The problem compounds as you grow.

2. Right-size the solution

Don't buy enterprise-scale solutions for mid-market problems. But don't cheap out with just BI tools on top of chaos either. Build appropriate architecture.

3. Modern cloud tools changed the economics

10 years ago, this project would have cost $800K+ and required a team of DBAs. Cloud data warehouses (Snowflake, BigQuery, Redshift) and modern data tools (Fivetran, dbt, Looker) made it accessible at 1/4 the cost.

4. Historical data reconstruction is harder than you think

Budget extra time for this. Old data is messy, incomplete, and requires business stakeholder decisions to reconcile.

5. Data quality is a process, not a project

The warehouse will expose data quality problems in your source systems. That's good—you need to know. But fixing them is ongoing work.

6. Change management is critical

You're not just implementing technology. You're changing how people work and make decisions. Training, champions, and executive sponsorship are mandatory.

7. Hire or develop data capability

You can outsource implementation, but you need internal capability for ongoing maintenance and evolution. Budget for at least one data engineer.

8. Start with business value, not technology

We didn't start by asking "should we use Snowflake or BigQuery?" We started with "what business questions can't you answer today?" The technology followed from the requirements.

When This Approach Works vs. Doesn't

This is right for you if:

  • Revenue $20M-$200M range
  • 100+ employees
  • Multiple data sources (3+)
  • Strategic decisions delayed by lack of data
  • Excel is your integration layer
  • Analysts spend most time compiling vs. analyzing
  • Leadership doesn't trust the numbers

This probably isn't right if you:

  • Revenue under $10M (too much complexity for your scale)
  • Have single integrated system that meets all needs (rare, but exists)
  • Don't have analytical needs beyond basic reporting
  • Can't invest $150K-$250K in proper implementation
  • Don't have or can't hire data engineering capability

Alternative approaches:

BI tool only ($40K-$60K):

  • If your data is mostly clean and in 1-2 systems
  • Need visualization more than integration
  • Faster, cheaper, but doesn't solve fragmentation

Enterprise data platform ($500K-$1.2M):

  • If you're $200M+ revenue
  • Complex multi-company, multi-geography
  • Need sophisticated data science capabilities
  • Have budget and team to support it

Do nothing:

  • Sometimes the honest answer
  • If Excel is working and you're not making costly mistakes
  • Just acknowledge the risks you're accepting

Technical Stack Recommendations

For teams planning similar implementations:

Cloud Data Warehouse:

  • Snowflake (what we used): excellent performance, easy to use, can get expensive
  • BigQuery: Google ecosystem, good for large data volumes, serverless
  • Redshift: AWS ecosystem, good for complex queries, requires more management

Extraction:

  • Fivetran: expensive but reliable, hundreds of connectors
  • Airbyte: open source alternative, more technical
  • Custom scripts: cheapest, most flexible, most maintenance

Transformation:

  • dbt: industry standard, SQL-based, version controlled, great community
  • Matillion: GUI-based, easier learning curve, more expensive
  • Dataform: Google's alternative, similar to dbt

Semantic Layer:

  • Looker: powerful, expensive, learning curve
  • Lightdash: open source alternative
  • Cube.js: developer-focused, flexible

BI Tools:

  • Tableau: powerful, expensive, good for complex viz
  • Power BI: Microsoft ecosystem, cheaper, good enough for most
  • Metabase: open source, simple, free

Our recommendation: Snowflake + Fivetran + dbt + Looker + Tableau for companies with $50M+ revenue and budget. BigQuery + Airbyte + dbt + Metabase + Power BI for smaller budgets.

The Bottom Line

DistribCo spent $180,000 over 14 months to move from Excel hell to unified analytics.

They found $520,000 in cost savings and revenue opportunities they couldn't see before. They reclaimed $125,000 annually in analyst productivity. They built a foundation for data-driven decision making that will compound value for years.

But here's what they really got: The ability to run an $85M company based on facts instead of Excel arguments.

The question isn't "can we afford a data warehouse?"

The question is: "how much are bad decisions from fragmented data costing us right now?"

For most mid-market companies, the answer is: "way more than $180K."

We're Thalamus. Enterprise capability without enterprise gatekeeping.

If your leadership team argues about whose spreadsheet is correct, we should talk. Not because we're definitely the right answer, but because we might help you calculate what data chaos is actually costing your business.

Sometimes the most valuable consulting is quantifying the cost of what you're already doing.

Related Products:

Related Articles

Case Studies

E-commerce at Scale: From Shopify to Custom Platform

Growing e-commerce business outgrowing Shopify limitations. When migration made sense, custom platform architecture, maintaining sales during transition, and 3.2x revenue growth enabled. $340K investment, 14-month timeline, transformational results.

Read More →

Ready to Build Something Better?

Let's talk about how Thalamus AI can help your business scale with enterprise capabilities at SMB pricing.

Get in Touch